logo
<
Calidad  Steel Frame Industrial Workshop Building Construction for Plastic and Rubber Injection Molding Production Plant Factory fábrica
Calidad  Steel Frame Industrial Workshop Building Construction for Plastic and Rubber Injection Molding Production Plant Factory fábrica
Calidad  Steel Frame Industrial Workshop Building Construction for Plastic and Rubber Injection Molding Production Plant Factory fábrica
Calidad  Steel Frame Industrial Workshop Building Construction for Plastic and Rubber Injection Molding Production Plant Factory fábrica
Calidad  Steel Frame Industrial Workshop Building Construction for Plastic and Rubber Injection Molding Production Plant Factory fábrica
Calidad  Steel Frame Industrial Workshop Building Construction for Plastic and Rubber Injection Molding Production Plant Factory fábrica
>

Steel Frame Industrial Workshop Building Construction for Plastic and Rubber Injection Molding Production Plant Factory

Nombre de la marca:LANJING
Número de modelo:LJ-WO-039
Lugar de origen:Porcelana
Certificación:CE\ISO45001\ISO9001
Cantidad mínima de pedido:1000m²
Precio:19.9-39.9$
Capacidad de suministro:40,000 toneladas por año
El tiempo de entrega:45 días
Condiciones de pago:T/T
Embalaje Estándar:Artículo único
Presupuesto
Main Structure: Acero galvanizado en caliente de alta resistencia Product Name: Taller de estructura de acero prefabricada
Crane Compatibility: El sistema de viga de grúa se puede preinstalar Floor Treatment: Estándar con piso resistente al desgaste con pulido de diamante
Enclosure System: Paneles de acero de color o paredes de paneles sándwich de lana de roca Space Dimensions: Longitud diseñada según requerimientos
Load Capacity: Capacidad de carga Carga sobre el suelo 1-5 toneladas/metro cuadrado Logistics Design: Grandes puertas de ascensor industrial (dimensiones personalizadas)
Fire Performance: Componentes de acero recubiertos con pintura ignífuga. Certification Compliance: Certificado según el sistema de gestión de calidad ISO 9001.
Environmental Control: Puede integrar ventiladores de techo, tragaluces. Installation Period: Aproximadamente 30-60 días laborables
High Light:

steel frame industrial workshop

,

injection molding production plant

,

steel structure factory building

Descripción del Producto
Our steel structure workshop is built with high-strength Q235/Q355 steel, featuring a large-span column-free design with a span of up to 8-40m. The open space perfectly accommodates heavy equipment layout and material turnover, improving production efficiency. It achieves 12-grade wind resistance and 9-grade seismic resistance, capable of withstanding extreme weather and geological disasters. Adopting dual anti-corrosion process of hot-dip galvanizing and electrostatic
Solicitar una cita

Por favor, utilice nuestro formulario de contacto de consulta en línea de abajo si tiene alguna pregunta, nuestro equipo se pondrá en contacto con usted tan pronto como sea posible.

Puedes subir hasta 5 archivos y cada archivo tiene un tamaño máximo de 10M.