logo
<
Qualidade  Steel Frame Industrial Workshop Building Construction for Plastic and Rubber Injection Molding Production Plant Factory fábrica
Qualidade  Steel Frame Industrial Workshop Building Construction for Plastic and Rubber Injection Molding Production Plant Factory fábrica
Qualidade  Steel Frame Industrial Workshop Building Construction for Plastic and Rubber Injection Molding Production Plant Factory fábrica
Qualidade  Steel Frame Industrial Workshop Building Construction for Plastic and Rubber Injection Molding Production Plant Factory fábrica
Qualidade  Steel Frame Industrial Workshop Building Construction for Plastic and Rubber Injection Molding Production Plant Factory fábrica
Qualidade  Steel Frame Industrial Workshop Building Construction for Plastic and Rubber Injection Molding Production Plant Factory fábrica
>

Steel Frame Industrial Workshop Building Construction for Plastic and Rubber Injection Molding Production Plant Factory

Nome da Marca:LANJING
Número do modelo:LJ-WO-039
Local de Origem:China
Certificação:CE\ISO45001\ISO9001
Quantidade mínima de pedido:1000m²
Preço:19.9-39.9$
Capacidade de fornecimento:40.000 toneladas por ano
Prazo de entrega:45 dias
Condições de pagamento:T/T
Embalagem padrão:Item único
Especificações
Main Structure: Aço galvanizado por imersão a quente de alta resistência Product Name: Oficina de estrutura de aço pré-fabricada
Crane Compatibility: O sistema de viga do guindaste pode ser pré-instalado Floor Treatment: Padrão com piso resistente ao desgaste com retificação de diamante
Enclosure System: Painéis de aço coloridos ou paredes de painel sanduíche de lã de rocha Space Dimensions: Comprimento projetado de acordo com os requisitos
Load Capacity: Capacidade de carga Carga de piso 1-5 toneladas/metro quadrado Logistics Design: Grandes portas de elevadores industriais (dimensões personalizadas)
Fire Performance: Componentes de aço revestidos com tinta à prova de fogo Certification Compliance: Certificado pelo sistema de gestão de qualidade ISO 9001
Environmental Control: Pode integrar ventiladores de telhado, claraboias Installation Period: Aproximadamente 30-60 dias úteis
High Light:

steel frame industrial workshop

,

injection molding production plant

,

steel structure factory building

Descrição do produto
Our steel structure workshop is built with high-strength Q235/Q355 steel, featuring a large-span column-free design with a span of up to 8-40m. The open space perfectly accommodates heavy equipment layout and material turnover, improving production efficiency. It achieves 12-grade wind resistance and 9-grade seismic resistance, capable of withstanding extreme weather and geological disasters. Adopting dual anti-corrosion process of hot-dip galvanizing and electrostatic
Solicite um orçamento

Por favor, use o nosso formulário de contato online abaixo se tiver alguma pergunta, nossa equipe vai voltar para você o mais rápido possível.

Você pode carregar até 5 arquivos e cada arquivo de tamanho máximo de 10M.